Warning: include(): Filename cannot be empty in /webHome/LFWZ011020/www/en/include/common.inc.php on line 8 Warning: include(): Failed opening '' for inclusion (include_path='.:/php-1.1/phpfarm-0.1.0/inst/php-7.3.7/pear/php/') in /webHome/LFWZ011020/www/en/include/common.inc.php on line 8
On November 11, 2013, 11, HuaSheng company in baotou steel group sheet plant no. 2 heating furnace area of the construction of the comprehensive utilization of waste heat of ORC demonstration project successfully connected to the grid, in operation.
This project adopts the ORC low grade waste heat power generation technology in the turbine, realized the domestic first ORC cogeneration units of industrial application, fill in the domestic low grade waste heat ORC turbine power generation technology application in the field of blank, its technical level in the international advanced level in the similar projects. Has a wide using prospect.