Warning: include(): Filename cannot be empty in /webHome/LFWZ011020/www/en/include/common.inc.php on line 8 Warning: include(): Failed opening '' for inclusion (include_path='.:/php-1.1/phpfarm-0.1.0/inst/php-7.3.7/pear/php/') in /webHome/LFWZ011020/www/en/include/common.inc.php on line 8
Beijing Huasheng signed an exclusive licensing agreement with Enertime to use
its 1MW ORC turbine
technology
1MW ORC turbine manufacturing license signature
ceremony between Beijing Huasheng and Enertime was held on December 3rd 2017. Mr. Yin Wenjie, the CEO of Beijing Huasheng, and David, the CEO of
Enertime respectively represented both sides and signed the contract.
Enertime Company is the largest ORC turbine
manufacturer in France, having multiple power generation demonstration projects
in Europe. In November 2017, the 3.2MW ORC power station was successfully
transported in Baosteel, China。 Enertime announces the signature of an exclusive license agreement for
1MW ORC turbines with Beijing Huasheng in Chinese market for five years.
Beijing Huasheng will work in close collaboration with Anshan Hongyuan Company and set up manufacturing base in Anshan to offer 1MW ORC turbine to China low-grade waste heat market.