Warning: include(): Filename cannot be empty in /webHome/LFWZ011020/www/en/include/common.inc.php on line 8 Warning: include(): Failed opening '' for inclusion (include_path='.:/php-1.1/phpfarm-0.1.0/inst/php-7.3.7/pear/php/') in /webHome/LFWZ011020/www/en/include/common.inc.php on line 8 The successful completion of the ORC waste heat power station in winter heating - News - 北京华晟环能科技有限公司
News
Position: Home > News > Show
The successful completion of the ORC waste heat power station in winter heating
发布时间:2014-10-15 18:25:00   |   点击:1632   |   作者:admin

On October 15, 2014, the ORC clemency board of waste heat power station began to undertake steel sheet mill district heating, the heating area of 60000 square meters. In the whole heating period of 2014-2015 for the stable operation of the ORC power plant, to ensure the heating temperature. Directly for sheet mill to save heating costs 1.3 million yuan.

Copy right:北京华晟环能科技有限公司  Contacts:庞先生  Telephone:400-800-8888  Fax:010-62367932  Phone: 332465477
 Address:北京市朝阳路工业园区